EntKuRo

Goals of this project are to develop a breadboard to unscrew the coupler and the development of a breadboard for the final uncoupling.


The introduction of automatic central buffer couplings within European standard gauge railways seems unfeasible in spite of the long-term efforts made in recent decades. The coupling and uncoupling of rail wagons and trains using old fashioned coupler chains is a complex procedure which requires a lot of time and is dangerous for the people doing this job. These disadvantages are therefore very relevant for marshalling yards. The feasibility study “BaKuRo” investigated whether an automated solution for uncoupling is feasible using available modern technology. The results of this study indicate that the automation of the uncoupling process seems to be feasible. This process comprises two steps in most cases. The first step (1) is the uncoupling of the air-brake hoses and the unscrewing of the coupling. The second step (2) is the unhooking of the coupling during the movement of the train to the marshalling hump.


Goals of the Project


The goals of the project are (a.) to develop a breadboard to unscrew the coupler (step 1 as mentioned above) which shall be tested in the lab and (b.) the development of a breadboard for the final uncoupling (step 2). This breadboard shall be tested in an enhanced lab environment using a real marshalling yard in the field. These two objectives will be supplemented by (c.) accompanying research dealing with questions of economic life-cycle management, operational consequences and industrial safety.


The project partners plan to use the following methods to reach the aforementioned goals. The mechanical construction will be developed using enhanced mechanical construction methods including appropriate simulations. Sensors and their algorithms will be developed based on prior experience with autonomous systems. The required architecture and the software development process will take into consideration the high reliability requirements of railways.


The additional research topics will be dealt with by comprehensive analysis of the economic feasibility, consequences for operational performance and the industrial safety of the staff.


 


Publications

Egger Martin, Stadlmann, B., Peter, T., Jürgen, Z., & Frank, M. (2019). Die Schraubenkupplung ist automatisierbar! Der Eisenbahningenieur, 06/2019, 18–21.
Stadlmann, B., Egger, M., Michelberger, F., & Zajicek, J. (2018). Automatisierung im Verschiebebahnhof. In Jahrbuch der Logistikforschung - Innovative Anwendungen, Konzepte & Technologie (pp. 73–82). Trauner Verlag + Buchservice.
Zellner, C., Michelberger, F., Stadlmann, B., Egger, M., Hattinger, M., & Zajicek, J. (2018, April 16). Automated handling of a screw coupling of freight wagons. Transport Research Arena (TRA) 2018, Vienna.
Egger, M., Zellner, C., Stadlmann, B., Saliger, F., Traussenegger, P., Zajicek, J., & Michelberger, F. (2018). Automatisches Trennen von Güterwagen mit Schraubenkupplung. ETR - Eisenbahntechnische Rundschau, 09/2018, 136–140.
Zellner, C., Stadlmann, B., Michelberger, F., & Zajicek, J. (2017). Automatisierung im Verschiebebahnhof. In Jahrbuch der Logistikforschung - Innovative Anwendungen, Konzepte & Technologien (pp. 73–82).
Partners
  • University of Applied Sciences Upper Austria
  • ÖBB Infrastruktur AG
  • AIT Austrian Institute of Technology GmbH
  • ULBRICH Maschinenbau- und Export-Import Betriebsg.m.b.H.
Funding
Austrian Ministry for Transport, Innovation and Technology - Research Program Future Mobility
Runtime
10/01/2015 – 09/30/2018
Status
finished
Involved Institutes, Groups and Centers
Carl Ritter von Ghega Institute for Integrated Mobility Research